

Development of Belawan Port - Phase 1
Package 1 civil work of Belawan Port development, North Sumatra, contained dredging and reclamation activities.


Bintan Alumina Refinery Port and Channel Navigation
Sea transport is crucial to the alumina refinery in Galang Batang, east of Bintan island, with annual capacity of 2.1 tons. Hence, it is...


Base manufacture project at PT Sokonindo Automobile
In a 30,000 square meter construction site, steel structures consisting of cutting-edge car factory and 3-storey office building takes...


Pengerukan Alur Nelayan
Engineering fishing channel within the proximity of Belawan port involves extensive work in 300.000 cubic meter of capital dredging ,...


Site Clearance and Land Filling at Oleochemical Plant
Investment by PT. Energi Sejahtera, a subsidiary of Sinar Mas Group, in chemical processing facility for crude palm oil on a 24 hectares...


Belawan Port Basin Maintenance Dredging
The annual maintenance dredging work at one of the busiest ports in Indonesia requires a total of 350,000 m3 clay-based material, with...


PLTU 2 Jateng Adipala Dredging Project, Cilacap, Central Java
With a total volume of 3,000,000 cubic meter of sand, the massive work in Central Java comprises capital dredging, port basin, turning...


Java Integrated Industrial and Port Estate Onshore Normalization, Gresik, East Java
As a huge integrated industrial zone with deep sea port and residential zone on 3,000 hectares of land, 24 km west of Surabaya, JIIPE is...


Marunda Center Terminal 1B Dredging Project, Marunda, Jakarta
Capital dredging in one of the most strategic ports in Jakarta required 3 months meticulous work of port basin, 75 meter wide and 500 m...