top of page

Marunda Center Terminal 1B Dredging Project, Marunda, Jakarta

  • Writer: Bina Mitra Indosejahtera
    Bina Mitra Indosejahtera
  • Apr 22, 2014
  • 1 min read

Updated: Jan 13, 2021

Capital dredging in one of the most strategic ports in Jakarta required 3 months meticulous work of port basin, 75 meter wide and 500 m in spot length, consuming over 300,000 cubic meter of sand to the extent of -8.5 meter CD in depth. Reported on-site material were mostly silt clay. Offshore dumping area spanned across 1.8 kilometer. Our Cutter Suction Dredger is of great significance in the success of this project.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page